You are here: Home » Products » Excavator Bearing Series » Sumitomo » TMY CASE Excavator Swing Gearbox Bearing KSC0205/KSC0206 for CX360

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

TMY CASE Excavator Swing Gearbox Bearing KSC0205/KSC0206 for CX360

KSC0206 Bearings are used in the Swing Reduction of Komatsu: CX350, CX330,CX360 ,SH350-3, SH350-5
Part No.: KSC0205/KSC0206/KSC0139/15049A1
Brand: TMY
MOQ: 1
Shipping Port; Guangzhou, Shenzhen, Qingdao…
Shipping Day: 2-6 Days
  • CX360

  • TMY

Availability:
Quantity:


Part Number

KSC0205/KSC0206/KSC0139/15049A1

Type

Excavator Swing Gearbox Bearing

Brand

TMY

Application

In Precision Instrument, low Noise Motor, Automobile and other Machine Industry.

Size

 MM

Material

Chrome steel GCr15



For Pipeline Construction

  1. Trench-Ready Durability: Manufactured to withstand the abrasive conditions of rocky trench floors and constant directional changes during pipe laying.

  2. Side-Load Capacity: Engineered to handle the extreme side loads encountered when excavating alongside existing pipeline corridors.

  3. Rock-Proof Construction: Built to survive impacts with boulders and bedrock without compromising structural integrity or performance.

  4. Precision for Sloping: Enables precise grade control and smooth operation during the critical trench sloping and benching phases.

  5. Project-Completion Life: Designed to last through entire multi-month pipeline projects without failure, avoiding costly work stoppages.





Product Photo:

TMY CASE Excavator Swing Gearbox Bearing KSC0205/KSC0206 for CX360TMY CASE Excavator Swing Gearbox Bearing KSC0205/KSC0206 for CX360






Recommend Products:

This is partial of our Excavator Bearings Stock List.

If you need other models, please feel free to contact me.

GE35

TMY CASE Excavator Swing Gearbox Bearing KSC0205/KSC0206 for CX360






Factory:

详情工厂图详情-黑灰-恢复的_07





Packaging:

网站包装图





Why choose us?

1. Trusted Product

2. Advanced Technology

3. Reliable Service

4. Competitive price



FAQ:

1. How can I get the price?

-We usually quote within 24 hours after we get your inquiry(Except weekend and holidays).
-If you are very urgent to get the price, please email us or contact us in Alibaba so that we can offer you a quote.

2. How to quickly and accurately buy products what lneeded?

A: Provide theoriginal parts number to us to check.

3. Are vou trading companv or manufacturer ?

A: We are a manufacturing and trading combo.

4. How long is your delivery time?

A: The normal delivery time of stock products after receiving payment is 2-5 days.

5. lf I don't know the part number, what shouldI do?

A: Please send us size and pictures of old products.


Previous: 
Next: 
We have an excellent technical team, our products in quality and quantity will make you satisfied, welcome to buy
  • +86-19128802335
  • No. 141, Donghuan Road, Zhuji Sub-district, Tianhe District, Guangzhou, China​​​​​​​
CONTACT US
We have an excellent technical team
Get Touch with Us
Follow Us
Copyright © 2025 Guangzhou Shunjin Construction Machinery Parts Co.,Ltd. All Rights Reserved.  |  Sitemap   |  Privacy Policy